BTB Plaza - The Transformer Marketplace

You are here: Home
  • Decrease font size
  • Default font size
  • Increase font size
Calculators

Capitalization of Losses
In order to help the transformer manufacturer to optimize the transformer design in accordance with your energy cost and actual transformer loading cycle, please use our supporting tool for calculating the capitalized transformer losses.

Total Operating Cost
The Total Operating Cost (TOC) of a transformer is a summary of purchase price and the capitalized losses. It is therefore essential to compare transformer bids calculating TOC, please use our supporting tool for calculating the TOC.
CALCULATORS

 

Transformer Factories

 wellconnected.jpg

Currently we have 274 Transformer Factories registered in our database from 49 different countries around the world. The production range of these factories is broken down to as follows:

Concept: Dry-type (169), Oil immersed (209).
Application: Distribution (223), Power (200), Earthing (38), Convertor (85), Rectifier (109), Furnace (88), Marine (34), Offshore (14), Railway (40), Reactor (40), Windmill (21).
 
For Transformer Manufacturers:
Register your factory here.